Finke, G. R., M. Singh, and P. Schönsleben. “PRODUCTION LEAD TIME VARIABILITY SIMULATION – INSIGHTS FROM A CASE STUDY”. International Journal of Industrial Engineering: Theory, Applications and Practice, vol. 19, no. 5, Dec. 2012, doi:10.23055/ijietap.2012.19.5.702.