Basar, A. “A NOVEL METHODOLOGY FOR TIME PLANNING OF RESOURCE-CONSTRAINED SOFTWARE PROJECTS WITH HESITANT FUZZY DURATIONS: A CASE STUDY”. International Journal of Industrial Engineering: Theory, Applications and Practice, vol. 26, no. 4, July 2019, doi:10.23055/ijietap.2019.26.4.3321.