Goyal, A., S. Sharma, and P. Gupta. “PERFORMANCE ANALYSIS OF A MULTIPLE COMPONENT MANUFACTURING SUBSYSTEM OF A RUBBER TUBE PRODUCTION PLANT UNDER PREEMPTIVE RESUME PRIORITY REPAIR”. International Journal of Industrial Engineering: Theory, Applications and Practice, vol. 16, no. 4, Aug. 2009, doi:10.23055/ijietap.2009.16.4.113.