Wang, H., Wang, H., Li, Y. and Wang, F. (2021) “PRODUCTION DECISION RESCHEDULING OF PREFABRICATED BUILDING PARTS SUBJECT TO INTERFERENCE FROM THE ARRIVAL OF NEW ORDERS”, International Journal of Industrial Engineering: Theory, Applications and Practice, 27(5). doi: 10.23055/ijietap.2020.27.5.6547.