Yearout, R. D., Krumpe, K., Lane, J., Lee, J., Manns, M. L., McKenzie, C. B., Nelms, L., Stockhausen, M. M. and Turnburke, L. N. (2010) “Deriving A Bridge to Transfer Unknown (Probabilistic) Times to Known (Deterministic) Times to Allow Confidence Level Estimates for a Time/Cost Tradeoff: A Critical Analysis of PERT/CPM Procedures”, International Journal of Industrial Engineering: Theory, Applications and Practice, 17(3). doi: 10.23055/ijietap.2010.17.3.378.