Basar, A. (2019) “A NOVEL METHODOLOGY FOR TIME PLANNING OF RESOURCE-CONSTRAINED SOFTWARE PROJECTS WITH HESITANT FUZZY DURATIONS: A CASE STUDY”, International Journal of Industrial Engineering: Theory, Applications and Practice, 26(4). doi: 10.23055/ijietap.2019.26.4.3321.