Muştu, S. and Eren, T. (2018) “MAXIMUM COMPLETION TIME UNDER LEARNING EFFECT IN PERMUTATION FLOWSHOP SCHEDULING PROBLEM”, International Journal of Industrial Engineering: Theory, Applications and Practice, 25(2). doi: 10.23055/ijietap.2018.25.2.3179.