Mokhtari Moghadam, A., Wong, K. Y. and Piroozfard, H. (2018) “SOLVING A HYBRID JOB-SHOP SCHEDULING PROBLEM WITH SPACE CONSTRAINTS AND REENTRANT PROCESS BY A GENETIC ALGORITHM: A CASE STUDY”, International Journal of Industrial Engineering: Theory, Applications and Practice, 24(5). doi: 10.23055/ijietap.2017.24.5.2371.