Hsiau, H.-J. and R.Lin, C.-W. (2010) “A GENETIC ALGORITHM APPROACH FOR OPTIMIZING CHEMICAL TOWER CONSTRUCTION PROJECT SCHEDULING WITH DYNAMIC RESOURCES CONSTRAINTS”, International Journal of Industrial Engineering: Theory, Applications and Practice, 17(2). doi: 10.23055/ijietap.2010.17.2.207.