Chou, H.-H., Wang, C.-T. and Sheu, R.-S. (2016) “A PRACTICAL MULTIPLE-TOOL-SET APPROACH FOR INCREASING AGILE RESPONSE IN OVERHAUL PRODUCTION WITH LIMITED RESOURCE REQUIREMENT VISIBILITY”, International Journal of Industrial Engineering: Theory, Applications and Practice, 23(2). doi: 10.23055/ijietap.2016.23.2.1809.