Goyal, A., Sharma, S. and Gupta, P. (2009) “PERFORMANCE ANALYSIS OF A MULTIPLE COMPONENT MANUFACTURING SUBSYSTEM OF A RUBBER TUBE PRODUCTION PLANT UNDER PREEMPTIVE RESUME PRIORITY REPAIR”, International Journal of Industrial Engineering: Theory, Applications and Practice, 16(4). doi: 10.23055/ijietap.2009.16.4.113.