BASAR, A. A NOVEL METHODOLOGY FOR TIME PLANNING OF RESOURCE-CONSTRAINED SOFTWARE PROJECTS WITH HESITANT FUZZY DURATIONS: A CASE STUDY. International Journal of Industrial Engineering: Theory, Applications and Practice, [S. l.], v. 26, n. 4, 2019. DOI: 10.23055/ijietap.2019.26.4.3321. Disponível em: https://journals.sfu.ca/ijietap/index.php/ijie/article/view/3321. Acesso em: 16 may. 2024.