HSIAU, H.-J.; R.LIN, C.-W. A GENETIC ALGORITHM APPROACH FOR OPTIMIZING CHEMICAL TOWER CONSTRUCTION PROJECT SCHEDULING WITH DYNAMIC RESOURCES CONSTRAINTS. International Journal of Industrial Engineering: Theory, Applications and Practice, [S. l.], v. 17, n. 2, 2010. DOI: 10.23055/ijietap.2010.17.2.207. Disponível em: https://journals.sfu.ca/ijietap/index.php/ijie/article/view/207. Acesso em: 19 may. 2024.