Hsiau, H.-J., & R.Lin, C.-W. (2010). A GENETIC ALGORITHM APPROACH FOR OPTIMIZING CHEMICAL TOWER CONSTRUCTION PROJECT SCHEDULING WITH DYNAMIC RESOURCES CONSTRAINTS. International Journal of Industrial Engineering: Theory, Applications and Practice, 17(2). https://doi.org/10.23055/ijietap.2010.17.2.207