[1]
Adetunji, O.A.B. and Yadavalli, V. 2012. AN INTEGRATED UTILISATION, SCHEDULING AND LOT-SIZING ALGORITHM FOR PULL PRODUCTION. International Journal of Industrial Engineering: Theory, Applications and Practice. 19, 3 (Jul. 2012). DOI:https://doi.org/10.23055/ijietap.2012.19.3.596.